Preparation Stage

Confirm the size and style of the door: Carefully check whether the size of the folding door matches the size of the door opening at the installation location. At the same time, confirm whether the style, color, etc. of the door meet the requirements. During the preparation stage for the door and window, it is necessary to confirm the customer’s requirements to avoid any errors during the production process.
Inspect the door opening: Check whether the shape of the door opening is regular, and whether the wall is vertical and flat. If there are uneven or non-vertical conditions, it is necessary to repair and adjust them to ensure the stability and sealing performance of the folding door after installation. Check the door opening of the folding door carefully to see if it is complete.
Prepare tools and materials: Prepare installation tools and materials such as an electric drill, screwdriver, wrench, level, hammer, pencil, tape measure, expansion bolts, self-tapping screws, door frame fixing pieces, sealant, foam adhesive, etc. Prepare relevant tools, and make sure to have all these tools ready during the installation. Also, when installing the folding door, trim the details of the corners.
Installation of the Door Frame

What are the installation steps of the folding door? They include the preparation stage and the installation of the door panels.


Positioning and marking: According to the size of the folding door, use a pencil and tape measure to mark the position on the top and both sides of the door opening to determine the installation position of the door frame. Ensure that the markings are clear and accurate for subsequent installation.
Install the bottom track of the door frame: Place the bottom track at the marked position at the bottom of the door opening, and use an electric drill and self-tapping screws to fix the track to the ground. The installation of the track should be level, and a level can be used for measurement and adjustment. If the ground is uneven, it is necessary to raise or adjust the track to ensure its flatness.
Install the two side columns of the door frame: Align the two side columns of the door frame with the marked positions on both sides of the door opening respectively, and use expansion bolts to fix the columns to the wall. When fixing the columns, use a level to check the verticality of the columns to ensure that the columns are perpendicular to the ground. There should be no less than 3 fixing points for each side column to ensure the stability of the door frame.
Install the top track of the door frame: Install the top track at the marked position on the top of the door opening, and use screws to fix the track to the two side columns of the door frame. During the installation process, ensure that the top track is parallel to the bottom track, and the distance between the tracks matches the size of the folding door.
Installation of the Door Panels
Install the pulley assembly: Install the pulley assembly at the top and bottom edges of each door panel according to the requirements of the product instruction manual. The installation of the pulley assembly should be firm to ensure that the pulleys can slide smoothly on the track. After installation, check whether the pulleys rotate flexibly. If there is any 卡顿 (sticking) phenomenon, it is necessary to adjust or replace the pulleys in a timely manner.

What are the installation steps of the folding door? They include the preparation stage and the installation of the door panels.


Install the door panels: Put the door panels with the pulley assembly installed into the tracks of the door frame one by one. First, align the pulleys at the bottom of the door panel with the bottom track, and then gently lift the door panel to make the pulleys at the top enter the top track. When putting in the door panels, pay attention to the direction and order of the door panels to ensure that the gaps between the door panels are uniform.
Adjust the position of the door panels: After the door panels are installed, use tools such as a screwdriver and wrench to fine-tune the position of the door panels. Adjust the height, levelness, and verticality of the door panels to make the gaps between the door panels and the door frame uniform, and ensure that the door panels can be folded and unfolded smoothly. At the same time, check whether the connection between the door panels is tight. If the gap is too large or too small, it is necessary to make adjustments.
Installation of Hardware Accessories
Install the door handle: Select an appropriate installation position for the door handle according to the design and usage habits of the folding door. Use a screwdriver to fix the door handle to the door panel to ensure that the door handle is firmly installed and can be used flexibly.
Install the lock: Select an appropriate lock for installation according to the type of the door and the safety requirements. Generally, folding doors can be installed with locks such as mortise locks and lever handle locks. When installing the lock, operate according to the installation instruction manual of the lock to ensure that the installation position of the lock is accurate and the lock core can work properly.
Install other accessories: According to the need, other hardware accessories such as door stops and door closers can also be installed. The door stop can prevent the door panel from colliding with the wall when it is closed, and the door closer can make the door panel close automatically and stay closed. The installation of these accessories should comply with the requirements of the product instruction manual, and ensure that they are firmly installed without affecting the normal use of the door.
Debugging and Sealing
Debug the folding door: After the installation is completed, conduct a comprehensive debug of the folding door. Fold and unfold the door panels repeatedly to check whether the movement of the door panels is smooth, and whether there are any sticking, abnormal noise, or collision phenomena. If any problems are found, it is necessary to check the track, pulleys, connection of the door panels and other parts in a timely manner, find out the reasons and make adjustments or repairs.

What are the installation steps of the folding door? They include the preparation stage and the installation of the door panels.


Check the sealing performance: Check the sealing performance between the folding door and the door frame to ensure that the door can effectively prevent the intrusion of dust, noise, wind and rain when it is closed. If there are large gaps, sealant or foam adhesive can be used to fill and seal the gaps. The use of sealant should be even and aesthetically pleasing, avoiding the appearance of glue marks and bubbles.
Cleaning: After the installation is completed, clean up the sundries and dust generated during the installation process, and use a clean cloth to wipe and clean the folding door to keep its surface clean and tidy.
The above are the detailed installation steps of the folding door. There may be some slight differences in the installation process of folding doors of different brands and models. Therefore, it is necessary to carefully read the product installation instruction manual before installation and strictly operate according to the requirements of the manual. If you are not familiar with the installation process or encounter difficulties, it is recommended to seek the help of professional installers.